Wellbore Genius
Initial Wellbore Fluid Mixture
Initialize each MD segment with the fluid actually in the pipe at t=0. Mass fractions per segment must sum to 1.
Segments
| Top MD [ft] | Bottom MD [ft] | brine [-] 9.8 ppg | slickwater-fr [-] 8.4 ppg | crosslink-gel [-] 8.6 ppg | ρ_eff [ppg] | |
|---|---|---|---|---|---|---|
| 9.80 | ||||||
| 8.40 |
Hydrostatic check
Wellhead → target hydrostatic head: 5387 psi
All segments valid