What this pad costs, built from the plan itself: the lateral it drills, the stages and perforation clusters it completes, and the proppant and fluid it pumps. Set how many wells sit on the pad and every number below scales with it.

Starting numbers — no plan solved yet
4 wells
32 stages
192 clusters
Priced from the well budget · 18 lines

0 of 6 inputs are your own data.

Assumed, not measured: well path, rock properties, production stream, oil price, well cost, budget line items. No fluid report loaded, so the plan itself is not solved yet.

What the pad costs
4 wells: $18.5MM to drill and complete, $5.7MM to operate for 120 months — $24.2MM all in.
Drilling
$13.82MM
Completion
$4.70MM
Operating (120 months)
$5.71MM
All in
$24.23MM
Per well, drilled and completed
$4.63MM
Per lateral foot
$2314/ft
Per stage
$578,600
Per cluster
$96,433

Leave at zero to skip the per-barrel operating cost

  • No production forecast was available, so the per-barrel operating cost is left out — only the fixed monthly cost is counted.
Line by line
Every line shows what it is priced off, so you can argue with the basis rather than the total.

Drilling

LinePriced offPer wellPad
Pad construction and site workone pad, shared by every well$0
Spud, vertical hole and casingfixed per well$2,110,000$8,440,000
Drilling the lateral2,000 ft x $232/ft$464,000$1,856,000
Wellhead and facilitiesfixed per well$880,000$3,520,000
Drilling total$13,816,000

Completion

LinePriced offPer wellPad
Fracture stages (pumping)8 stages x $66,000$528,000$2,112,000
Wireline and pumpdown8 stages x $0$0
Perforating the clusters48 clusters x $6,500$312,000$1,248,000
Proppant3,600,000 lb x $0.045/lb$162,000$648,000
Fluid and chemicals72,000 bbl x $2.40/bbl$172,800$691,200
Completion total$4,699,200

Operating

LinePriced offPer wellPad
Fixed operating cost120 months x $11,900/month per well$1,428,000$5,712,000
Lifting, water handling and treatingneeds a production forecast$0
Operating total$5,712,000
Where the rates come from
Drilling, completion and operating money is written once, in the well budget, and read here. Turn the switch off if you want this page to keep its own separate rates.
Use the well budget’s lines

Every line below is priced off the 18 budget lines — $4,628,800 per well to drill, complete and equip, $11,900 a month to operate. Edit them on the well budget page and this page follows.

Drilling ($/lateral ft)
$232/ft
Spud and casing ($/well)
$2,110,000
Pumping ($/stage)
$66,000
Perforating ($/cluster)
$6,500
Proppant ($/lb)
$0.045/lb
Fluid ($/bbl)
$2.40/bbl
Wellhead and facilities ($/well)
$880,000
Operating ($/well/month)
$11,900
Edit the budget lines

No budget line prices barrels, so this one stays here

The stage and cluster design comes from the pad plan, the drilling, completion and operating lines come from the well budget, and the barrels to charge lifting against come from the rate forecast.