A full pad plan for my well, from my own data

Your fluid report sets the pressures, your deviation survey sets the geometry, and anything no imported file can measure stays exactly as entered. Every row below says which of the three it is.

My well path
No survey loaded — the path is designed from the plan
Drop or paste the directional survey for this well — measured depth, inclination and azimuth, in feet or metres. The plan takes its landing depth, lateral length and heading from it, the well path export becomes your surveyed hole, and the 3D grid and viewer cut along the path as drilled.

Drag your survey file here

CSV, TSV or plain text with measured depth, inclination and azimuth — or click to browse.

Keeping more than one hole? Open the survey database to save a survey per well, file each one under its pad, and switch the plan between them.

My core and fluid reports
Nothing measured yet: closure uses the published HFTS-1 core fit and the pressures use the starting fluid. Load your own reports below to replace both.
Core: example fit
Fluid: starting report
Core report — sets closure stress and rock stiffness

No core loaded. One row per cored interval: depth, Young's modulus, Poisson's ratio, closure or minimum stress, and — where the core cut a fracture — propped width and proppant concentration.

Fluid report — sets the pressures and net pressure

No fluid report loaded. A lab report with the stated gravity, gas-oil ratio and bubble point, plus the liberation table, is enough.

My well, my completion
Spacing and stage count are completion decisions, and the rock constants stand as entered until a core report measures them. Everything else on this page comes off an imported file.

Used when no survey is imported. 0 ⇒ stages × spacing.

Spread over the geometry above, so stage count and spacing drive the per-stage job the economics step prices.

Rock specs: library starting case. Enter your own depth, pay thickness, porosity, permeability and closure stress to plan against real rock.Well specsField database
What the hauling costs
42 mi one way
Loads are this plan's own sand and water divided by the hauler's capacity. The distance, mileage rate, load fee and standby rate set the price of each load — and the round trip sets how many loads one truck can turn in a day.
Haul cost per well
$558k
$279/ft of lateral
Whole pad
$2.23MM
4 wells
Sand rate
$834/load
54 % of the bill is miles
Loads a truck turns
3.2/day
3.7 hr round trip
What movesLoads a wellRate a loadCost a well
Sand72.0$834$60k
Fresh water553.8$640$355k
Produced water off the pad193.8$738$143k
Haul cost a well$558k

Want to hand-tune the plan afterwards? Open the expert form or look at the fluid on its own.