A full pad plan for my well, from my own data
Your fluid report sets the pressures, your deviation survey sets the geometry, and anything no imported file can measure stays exactly as entered. Every row below says which of the three it is.
Drag your survey file here
CSV, TSV or plain text with measured depth, inclination and azimuth — or click to browse.
Keeping more than one hole? Open the survey database to save a survey per well, file each one under its pad, and switch the plan between them.
No core loaded. One row per cored interval: depth, Young's modulus, Poisson's ratio, closure or minimum stress, and — where the core cut a fracture — propped width and proppant concentration.
No fluid report loaded. A lab report with the stated gravity, gas-oil ratio and bubble point, plus the liberation table, is enough.
Used when no survey is imported. 0 ⇒ stages × spacing.
Spread over the geometry above, so stage count and spacing drive the per-stage job the economics step prices.
| What moves | Loads a well | Rate a load | Cost a well |
|---|---|---|---|
| Sand | 72.0 | $834 | $60k |
| Fresh water | 553.8 | $640 | $355k |
| Produced water off the pad | 193.8 | $738 | $143k |
| Haul cost a well | $558k |
- Hauling fresh water costs more than hauling the sand — price a temporary water line before locking the budget.
No fluid imported yet
Want to hand-tune the plan afterwards? Open the expert form or look at the fluid on its own.