Wellbore Genius
Help

Field budget

Your wells on your rigs, each paced on its own lab curve — the whole programme cost, what it has cost so far, and what is still missing.

Team record
This field lives in this browser only. Sign in and the wells, well status, rig roster, lab sweeps and AFE inputs follow you to any browser and to your team.
Local only
Wells: 5
Rigs: 4
Lab: 3
Money: 4
Sign in to share this fieldNothing is lost either way — signing in uploads what is already here.
Field AFE
$0
0 of 0 wells · 0 ft
Recorded spend
$0
0 well(s) with actuals · forecast $0
Rig spread + diesel
$0
0 gal planned · 0/0 rigs specced
Readiness
Not budgeted
0/0 wells on measured mud · $0 lab delta
Lab spend
What the lab invoiced for the sweeps behind these curves — bench, sample, consumables and shipping on the ticket, plus the lab's overhead — charged into the fleet AFE next to rig hours and diesel. Entered on /lab-record.

Lab spend

$0

0 sweep(s) booked

Ticket

$0

bench · sample · consumables

Overhead

$0

no ticket recorded

AFE incl. lab

$0

forecast $0

WellSweepsTicketOverheadLab total% of AFELatest sweep
No wells stored yet.
Before this number is fully real
Each gate names the page that closes it. Warnings still produce a budget; blocked items are left out of the totals.

No wells stored

Add wells on /well-database before the field can be budgeted.

Not budgeted

No rigs on the roster

Add rigs on /rig-roster so the programme has iron to schedule.

Not budgeted
Wells
AFE from the field plan against the stage spend recorded on /well-tracker.
WellRigFootageAFEActualVariance$/ftSpud → releaseInputs
No wells stored yet — add a well to build the field.
Rigs
Programme hours, diesel and spread cost per rig, rolled up from the wells it drills.
RigWellsHoursDiesel (gal)PlannedLab ticketAll-inActual$/ftInputs
No rigs on the roster — add a rig.
Forecast vs plan
No actuals
The whole field's planned ECD, pump rate and rig days graded against the real numbers logged on the tracker, the morning report and the ECD readings.

No wells in the programme yet — queue wells on /field-plan to grade the field against real data.

Field ECD (plan → measured)

ppg

bias ppg · RMSE ppg

Pump rate (plan → run)

gpm

bias gpm

Rig days (earned → recorded)

0.0 d

0.0 d booked · delta d

Programme footage

0%

of 0 ft · 0/0 wells reporting

WellRigProgressECD plan → meas.Δ ppgRate plan → runΔ gpmDays earned → rec.Δ dGrade
No wells in the programme yet.

fieldBudgetForecast.v1 · fieldPlan × labEcd × wellTracker × wellActuals × ecdReadings

Rig cost history
No dated rig cost is on record yet, so the spread below charges whatever day rate and mob sit on the roster today. Open rig cost history.
Rig cost
The day rate, delivered diesel price and burdened crew cost behind the spread and the monthly breakdown below are entered per rig on /rig-cost.
Spread day lines
What a rig-day actually costs: rig time, diesel, crew and lab per day, priced on each rig's own burn rate, fuel price and crew — not a flat day rate.
All rigs on roster spec

No rigs on the roster yet — add rigs on /rig-roster and assign wells on /rig-schedule to price a spread day.

By calendar month
Each well's rig days, diesel and mud dollars split on month boundaries from its spud→release window. Rig time is charged at the contract day rate, the move / mob lump books to the month the rig arrives, and lab tickets to the month the sweep was run. Wells with clocked runs on /footage-ledger bill those measured days — the same days /drilling-forecast charges — and their rig time, diesel and crew re-price at the contract rates.

Rig days are the plan's ROP solve — log clocked runs on /footage-ledger to bill the days the rig actually kept.

MonthRig daysMeasured daysPlanned daysActual daysDiesel (gal)Actual dieselMud fluidLab ticketsMud spendDay rate $/dRig timeMove daysMove / mobDiesel $Crew $Rig spreadFootageWells
No wells on the programme yet — assign a rig on /rig-schedule to put months on the calendar.

Loading wells… · programme 0 days,