Wellbore Genius
Help
Dashboard

Field plan

Every well's footage from its profile, pace from its drilling plan, and dates, rig and dollars from its rig schedule — queued so one rig only drills one well at a time.

Field summary
0 of 0 wells on the programme.
Field footage
0 ft
0 wells
Rig days
0
0 d queued
Field pace
0 ft/d
programme 0 d
Field AFE
$0
$0/ft
First spud
Last release
Rigs working
0 / 0
All rigs loaded
As-drilled credit
0 ft
No tracker footage entered yet
Model
fieldPlan.v1
plan · schedule · profile

Enter stage footage on the well tracker and the queue and rig chart update here.

Real mud pacing
0 wells paced on their own Fann curve. Rate capped at 3,500 psi standpipe and 1,200 hhp.
Programme shift
0 d
applied to the plan
Fleet circulating
0 bbl/d
0 pump hhp
Pump diesel
0 gal/d
at the capped rates
Slowest well

No wells on the programme yet — add a well and a rig to pace it on real mud.

fieldPlanLabPace.v1 · rate cap from the well's fitted n/K/τ₀ → pace scale + fleet mud demand

Stage ECD on measured mud
Every stage's ECD and circulating cost solved on the well's own fitted n / K / τ₀. 0 wells on a lab curve.

No well profile intervals yet. Build a profile on /well-profile and publish a Fann sweep on /fann-lab, and every stage's ECD and cost is solved on the measured mud here.

ECD is referenced to each stage's bottom depth and flagged against the profile's frac gradient and ECD margin.

Well-by-well pacing
Assign the rig, pin the spud date and set the hours the spread turns — every edit writes the same per-well record rig schedule keeps, and the queue re-solves immediately. Toggle a well off to pull it out of the programme. Actual ft/day comes from the footage and hours recorded on well actuals.

No wells on the programme yet. Add one on the well database.