Wellbore Genius
Help
Dashboard

Well budget

Every stored well's total drilling cost, the stage breakdown behind it, and planned versus actual spend day by day on the rig schedule's own calendar.

As-drilled solve
Footage, mud weight and pump rate from /well-tracker re-solved into stage dollars. Wells with typed stage dollars are left alone.

Stages solved

0

0 well(s) · 0 ft

Solved hours

0 hr

0 gal diesel · 0 rig(s)

Solved cost

$0

earned plan $0 · Δ $0

ECD flags

0

stages over the frac gradient

WellFootageMud / rateMax ECDHoursSolved costΔ vs earned plan
No footage recorded yet — enter stage footage on /well-tracker and the solved stage dollars appear here.

trackerSolverLink.v1 · tracker footage/mud/rate × stage ECD solver → rig hours, diesel, cost

Fleet budget
AFEs rolled up per well from the drilling plan's pace, the rig schedule's calendar and the cost rates — 0 of 0 wells have actuals recorded.
Fleet planned
$0
0 wells
Recorded spend
$0
0 wells costed
Forecast
$0
actuals where known
Variance
$0
0.0% vs plan
Fleet $/ft
$0/ft
0 ft
WellRigFootage ftPlannedRecordedForecastVariance$/ftSpud → release
Planned vs actual spend — no well
Each stage's cost spread across the calendar days it occupies. The recorded curve stops at the last stage with real spend recorded in the stage table below; the forecast carries the remaining plan forward from there.
Planned to date
$0
no actuals yet
Recorded to date
$0
Variance to date
$0
under plan
Peak daily burn
$0/d
0 calendar days

No dated stages on this well yet — assign a rig on the rig schedule so the stages land on a calendar.

Stage cost breakdown — no well
Type each stage's real spend straight into the table — the spend curve, the tiles above and the fleet roll-up update as you go, and the same numbers show up on the cost plan. costPlan.v1 · drillingPlan stages × rigSchedule calendar

No stages on this well yet — build one on the drilling plan. Once stages exist, real spend can be typed in per stage right here.