Wellbore Genius
Dashboard
Cost plan
Stage costs and the total well budget, built from the drilling plan's stages and the rig schedule's calendar — no numbers are re-derived here.
Check before you circulate this AFE
- No stages yet — build a drilling plan for this well first.
Planned total
$0
0 stages
Forecast (actuals where known)
$0
0/0 stages costed out
Variance
$0
0.0% vs plan
Cost per foot
$0/ft
0 ft drilled
Cost per day
$0
— → —
Lab re-run & cost drivers
Costed on the PV/YP estimate — publish a Fann sweep for this well to re-run the sheet on measured mud. Mud-weight and pump-rate sensitivities below still apply.
PV/YP fallback
Fann labLab column falls back to the PV/YP estimate — no fitted Fann curve is stored for this well.
- No stages to cost — build a drilling plan for this well first.
Lab vs PV/YP total
$0
0.00% · worst stage — $0
Mud weight leverage
$0/ppg
Peak share 0% on —
Pump rate leverage
$0/100 gpm
Peak share 0% on —
Stages flagged
0/0
0 mud-driven · 0 rate-driven
Cost by stage
Planned versus recorded actual, stage order taken from the rig schedule.
Solving the drilling plan…
Where the money goes
Programme total split by AFE category.
Nothing priced yet.
Stage cost sheet
One row per drilling-plan stage on its rig-schedule window. Type an actual to track variance.
Solving the drilling plan…
Category roll-up
Each line shows which page owns the driver behind the dollars.
| Category | Driver | Source | Planned | Share | $/ft |
|---|---|---|---|---|---|
| Rig time | Working hours × day rate | Rig schedule | $0 | 0.0% | $0 |
| Rig moves | Move hours + mobilisation | Rig schedule | $0 | 0.0% | $0 |
| Standby | Waiting-on-rig hours | Rig schedule | $0 | 0.0% | $0 |
| Mud & weight-up | Hole volume × mud weight | Drilling plan | $0 | 0.0% | $0 |
| Pump energy | hhp·hr while circulating | Drilling plan | $0 | 0.0% | $0 |
| Bits & downhole tools | $/ft on stage footage | Cost rates | $0 | 0.0% | $0 |
| Casing & cement | $/ft on stage footage | Cost rates | $0 | 0.0% | $0 |
| Services | $/day on stage days | Cost rates | $0 | 0.0% | $0 |
| Logistics & camp | $/day on stage days | Cost rates | $0 | 0.0% | $0 |
| Programme lump sum | Allocated by footage | Cost rates | $0 | 0.0% | $0 |
| Contingency | % of allocated stage cost | Cost rates | $0 | 0.0% | $0 |
Cost rates
Saved per well in this browser. Rig time, moves and standby come from the rig schedule's own day rates — the fallback below is only used for unscheduled stages.
costPlan.v1 · drillingPlan stages × rigSchedule calendar