Wellbore Genius
Drilling plan
Rig schedule
The drilling plan's ROP and flat-time timeline landed on a real calendar — rigs assigned per stage, standby when the iron isn't free, move days and mob costs on rig changes, and a day-rate budget tracker. Pace is read straight from the plan: rigSchedule.v1 · drillingPlan timeline.
Team record
This field lives in this browser only. Sign in and the wells, well status, rig roster, lab sweeps and AFE inputs follow you to any browser and to your team.
Local only
Wells: 5
Rigs: 4
Lab: 3
Money: 4
Sign in to share this fieldNothing is lost either way — signing in uploads what is already here.
Programme
Stages and pace come from the drilling plan; rigs, dates and spend are stored in this browser.
Live spud
—
Set in the working calendar
Stages
…
0 ft on the programme
Rig days
0 d
+0 d contingency
Working calendar
Spud and release dates are solved against this calendar and today's date (2026-09-12), so a plan left alone keeps quoting live dates instead of a date that has already passed. rigCalendar.v1 · workweek + blackout roll-forward
A spud date that has passed re-bases on the next working day, so the plan stays live.
Off = day-shift only; stage hours then spread over more calendar days.
0 d
0 working days · 0 d non-working
None — holidays, freeze-off and permit windows go here.
Spud provenance
No spud date stored — anchored on the next working day, 2026-09-12
Release solved at — after 0 rig days over 0 calendar days.
Spud
—
First stage window opens
Rig release
—
Last stage complete · 0 calendar d
Standby
0 d
Waiting on rig availability
Rig moves
0
0 d of move time
Real fleet — Patterson 219 & Nabors X12
Contract day rate, standby, move window and diesel burn for the two rigs actually working this field, dealt whole wells at a time. This is the assignment well run, drilling forecast and rig budget read.
Patterson 219
Patterson-UTI
- Day rate
- $42,000/d
- Standby
- $21,000/d
- Move
- 2 d · $250,000
- All-in spread
- $62,719/d
0 well(s) on this rig
Nabors X-14
Nabors
- Day rate
- $47,500/d
- Standby
- $24,000/d
- Move
- 3 d · $310,000
- All-in spread
- $68,219/d
0 well(s) on this rig
0 well(s) still need a rig.
| Well | Stages | Rig | Status |
|---|---|---|---|
| No wells stored yet — add one on the well database. | |||
Rig roster
Day rate, standby rate, move window and the date each rig comes free. Availability pushes a stage's start out and books the gap as standby. Only rigs ticked "In schedule" on the rig roster can be assigned to stages.
| Rig | Contractor | Day rate $/d | Standby $/d | Move d | Mob $ | Available from | |
|---|---|---|---|---|---|---|---|
| No rigs yet — add one to start scheduling. | |||||||
Real-well solver on the timeline
Pick a well with stored formation data and a solved drilling plan to audit each scheduled stage against the advisor.
Stage calendar
Drilling hours are the plan's footage ÷ ROP; flat time is the plan's non-drilling allowance. Move and standby time is added by this page before work can start.
| Stage | Rig | Start | End | ROP ft/hr | Drill hr | Flat hr | Move d | Standby d | Stage cost | Status |
|---|---|---|---|---|---|---|---|---|---|---|
| Nothing scheduled yet. | ||||||||||
Budget tracker
Rig time, moves and standby priced from the roster; record actuals to see variance.
Cost per foot
$0
0 ft
Cost per day
$0
0 d
| Line | Basis | Planned | Actual | Variance |
|---|---|---|---|---|
| Rig time | 0.0 d on the spread day rate | $0 | — | |
| Rig moves & mobilisation | 0 moves including rig-up time | $0 | — | |
| Standby / waiting on rig | 0.0 d at the standby rate | $0 | — | |
| Services & consumables | Programme lump sum | $185,000 | — | |
| Schedule contingency | 10% of rig time | $0 | — | |
| Total | Forecast = actuals where recorded | $185,000 | $185,000 | $0 (0%) |