Rig budget

Planned versus actual hours, diesel and cost for every rig on the schedule roster. Programme hours come from the wells each rig drills in the field plan; crew, diesel burn and hourly cost come from each rig's own record on the rig roster — edits here save straight back to it.

As-drilled solve
Footage, mud weight and pump rate from /well-tracker re-solved into rig hours, diesel and cost. Hand-typed actuals always win.

Stages solved

0

0 well(s) · 0 ft

Solved hours

0 hr

0 gal diesel · 0 rig(s)

Solved cost

$0

earned plan $0 · Δ $0

ECD flags

0

stages over the frac gradient

RigFootageWork hrStandby / move hrDiesel (gal)Pump factorCost
No footage recorded yet — enter stage footage on /well-tracker and rig hours, diesel and cost fill in here.

trackerSolverLink.v1 · tracker footage/mud/rate × stage ECD solver → rig hours, diesel, cost

Fleet iron
0 of 0 rigs have actuals recorded.
Planned hours
0 hr
0% turning to the right
Recorded hours
0 hr
0 hr vs plan
Planned diesel
0 gal
0 gal recorded
Planned cost
$0
forecast $0
Lab ticket in plan
$0
No lab sweeps booked yet
Cost variance
$0
0.0% vs plan
Crew on the roster
0 hands
0 of 0 rigs fully specced
Mean drilling burn
Every rate off the roster
Mean rig hour
Spread + crew + diesel
Dearest hour
No rigs on the roster
RigWellsCrew$/hrPlanned hrActual hrHr variancePlanned galActual galPlanned costActual costCost varianceWindowStatus
Rig budget vs clocked hours
Type each rig's daily rate, budgeted days and (optionally) a dollar envelope. Committed spend is the hours clocked on /rig-hours-ledger ÷ 24 at that rate — variance is committed minus budget.
Budget
$0
0.0 d budgeted
Committed
$0
0.0 clocked hr
Variance
$0
under budget
Budget used
0/0 rigs clocked
Rig$/dayBudget daysBudget $Clocked hrClocked dCommittedVarianceRemainingDay var.
No rigs on the roster yet — add iron on /rig-roster.

No rigs on the roster.

Rig rates, days and cost
What the AFE actually charges per rig, and where each number comes from. A rate still sitting on the seeded template is flagged as a guess; a rate you typed on the roster counts as real; and once a rig has recorded cost over at least three recorded days, its own measured $/day takes over. Days come from the programme hours /field-plan already solved — nothing here is re-guessed.
Fleet AFE at these rates
$0
$0 of it on template guesses
On real rates
100%
0 of 0 rigs fully rated · 0 measured
Programme days
0
0 d recorded
Mean day rate
measured

No rigs on the roster yet — add iron on /rig-schedule and its rates land here.

rigRateBook.v1 · roster rates vs template seed vs measured $/day

Diesel from the lab curve, not an assumption
The pumps are the rig's biggest engine load, and the horsepower they draw is set by the circulating pressure the mud actually costs. Each well's fitted n, K and τ₀ from the Fann lab is solved for standpipe + annular loss, converted to pump hhp (ΔP·q/1714) and then to gal/hr. That pump term replaces the roster's assumed share, so hotel and rotary burn stay where the roster put them. Wells without a sweep keep the advisor's PV 18 cP / YP 12 mud.
Wells on measured mud
0 of 0
0 of 0 rigs re-fuelled from the lab
Fleet fitted curve
No fitted sweep in the programme yet
Diesel on lab fit
0 gal
+0 gal vs assumed (0.0 %)
Fuel cost swing
$0
No rigs on the roster

No measured curve applied — the diesel line is the roster assumption.

Run one real rig against its saved roster
Pick a rig and its programme diesel is priced twice on identical hours: once on the burn saved against that rig on the roster, once on the pump horsepower its wells' fitted n, K and τ₀ really demand. Standby and rig-move burn are shown at parity because the pumps are down — the whole dollar delta is hydraulic.
Linked to well-budget stage dollars
Every dollar recorded per stage on well budget belongs to the rig drilling that well. Those dollars earn the rig's planned hours pro rata, burn diesel at its own rates, and fill any actual left blank above — anything typed by hand wins.
Stage dollars recorded
$0
0 stages on 0 wells
Earned rig hours
0 hr
0 of 0 rigs linked
Linked diesel
0 gal
earned hours × burn rates
Linked rig cost
$0
rig-borne share of stage $ + diesel

No per-stage dollars recorded yet. Enter real spend per stage on /well-budget and these rig rows update themselves.

Link: rigStageSpend.v1 · well-budget stage dollars → rig hours & cost

Model: rigBudget.v1 · fieldPlan hours × rig burn rates