Next: Step 1 — Lab curve
No Fann sweep is stored for this well, so the run falls back to a PV/YP estimate.
- Publish a sweep for this well to unblock the measured-mud run.
No Fann sweep is stored for this well, so the run falls back to a PV/YP estimate.
- Publish a sweep for this well to unblock the measured-mud run.
There is no scheduled stage to carry — the drilling programme is empty.
- Rigs available
- 0
- Add stages on /drilling-schedule before scheduling a rig.
Currently: No rig assigned. The assignment lands on every stage of the well, so the drilling forecast and rig budget both update at once.
No stage is costed yet — the sheet has nothing to price.
- Add stages and rates before the AFE can be solved.
There is no stage ledger to walk — the programme is empty.
- Add stages on /drilling-schedule to start the walk.
AFE on real footage
$0
0 ft
AFE the plan guessed
$0
0 ft
Footage moved
$0
of the sheet
Cost / ft
—
plan —
Pace on the ledger
—
plan —
Pace drift
—
no measured duration yet
Days the AFE carries
0.0 d
plan 0.0 d · measured 0.0 d
Whole well at measured pace
—
sheet $/day —
Rig $/day
—
no rig assigned to this well
Rig spread on AFE days
—
0.0 d × —
Spread breakdown
—
rig time · diesel — · crew —
Sheet vs rig $/day
—
no rig spread to compare
- Add stages and rates on /cost-plan before footage can move the AFE.