Drilling forecast
Footage ledger
Every run with the clock it was made on. Start and stop times turn logged footage into a measured ft/day, which /drilling-forecast charges the remaining hole at instead of the plan's ROP.
Measured pace
Loading the forecast's stages…
Measured pace
—
no planned pace
On-bottom days
0.00 d
0/0 runs clocked
Elapsed span
—
needs two clocks
Footage logged
0 ft
0 of 0 stages
- No runs logged yet — /drilling-forecast still charges footage at the planned pace.
Log a run
Footage between two times. The stop time seeds the next run's start, so a shift can be typed straight down the page.
Runs
Oldest start first — the clock the forecast reads.
No runs yet. Until one is clocked, the forecast charges logged footage at the planned pace.
Pace by stage
What /drilling-forecast charges each stage's elapsed time at — measured where a run is clocked, planned everywhere else.
| Stage | Planned ft | Logged ft | Days | Measured ft/d | Plan ft/d | Basis |
|---|