Wellbore Genius
Help
Drilling forecast

Footage ledger

Every run with the clock it was made on. Start and stop times turn logged footage into a measured ft/day, which /drilling-forecast charges the remaining hole at instead of the plan's ROP.

Measured pace
Loading the forecast's stages…

Measured pace

no planned pace

On-bottom days

0.00 d

0/0 runs clocked

Elapsed span

needs two clocks

Footage logged

0 ft

0 of 0 stages

Log a run
Footage between two times. The stop time seeds the next run's start, so a shift can be typed straight down the page.
Runs
Oldest start first — the clock the forecast reads.

No runs yet. Until one is clocked, the forecast charges logged footage at the planned pace.

Pace by stage
What /drilling-forecast charges each stage's elapsed time at — measured where a run is clocked, planned everywhere else.
StagePlanned ftLogged ftDaysMeasured ft/dPlan ft/dBasis