Wellbore Genius
Help

Ops dashboard

Every rig and well, the days they really kept and the dollars those days cost. Days come from /footage-ledger's clocked runs, then /rig-calendar dates, then the programme. Dollars are those days at each rig's /rig-cost spread.

programme
Rig dashboard

Fleet

0 rigs · 0 wells

0 ft on the books

Rig days

0 d

plan 0 d · +0 d · 0 d clocked

Pace

no footage yet

Spend at spread

$0

—/d blended · AFE $0 · —

Measured coverage
Share of wells whose days come from a real clock or a real calendar instead of the programme.
0%

0 clocked · 0 d dated · 0 d still on the programme

Central rig record
In sync
Kept in the rig database: dated contracts also shown on /rig-cost-history and entered spuds from /rig-calendar are folded onto the roster, so /rig-cost and /ops-dashboard price the same rig the same way.

No rigs on the roster yet.

rigDatabaseSync.v1 · /rig-cost-history rates + /rig-calendar spud → roster (/rig-cost, /ops-dashboard)

Rigs
Click a rig to filter the well table. Spread is the contract entered on /rig-cost.
RigWellsFootage ftDaysBasisSpread $/dSpend $$/ft
Reading the roster…
Wells
Footage and pace are measured wherever a run is clocked; the programme figure stays alongside so drift is visible.
WellRigFootage ftDaysBasisft/d$/dSpend $vs AFE
Reading the programme…
What's still guessed
  • No wells in the programme yet — save a well and give it a rig on /rig-schedule.

opsDashboard.v1 · rigs × wells × clocked days (/footage-ledger → /rig-calendar → plan) × /rig-cost spread