Wellbore Genius
Ops dashboard
Every rig and well, the days they really kept and the dollars those days cost. Days come from /footage-ledger's clocked runs, then /rig-calendar dates, then the programme. Dollars are those days at each rig's /rig-cost spread.
programme
Rig dashboardFleet
0 rigs · 0 wells
0 ft on the books
Rig days
0 d
plan 0 d · +0 d · 0 d clocked
Pace
—
no footage yet
Spend at spread
$0
—/d blended · AFE $0 · —
Measured coverage
Share of wells whose days come from a real clock or a real calendar instead of the programme.
0 clocked · 0 d dated · 0 d still on the programme
Central rig record
In sync
Kept in the rig database: dated contracts also shown on /rig-cost-history and entered spuds from /rig-calendar are folded onto the roster, so /rig-cost and /ops-dashboard price the same rig the same way.
No rigs on the roster yet.
rigDatabaseSync.v1 · /rig-cost-history rates + /rig-calendar spud → roster (/rig-cost, /ops-dashboard)
Rigs
Click a rig to filter the well table. Spread is the contract entered on /rig-cost.
| Rig | Wells | Footage ft | Days | Basis | Spread $/d | Spend $ | $/ft |
|---|---|---|---|---|---|---|---|
| Reading the roster… | |||||||
Wells
Footage and pace are measured wherever a run is clocked; the programme figure stays alongside so drift is visible.
| Well | Rig | Footage ft | Days | Basis | ft/d | $/d | Spend $ | vs AFE |
|---|---|---|---|---|---|---|---|---|
| Reading the programme… | ||||||||
What's still guessed
- • No wells in the programme yet — save a well and give it a rig on /rig-schedule.
Rig performanceDrilling calendarClocked runsRig ratesRig calendarField budgetAFE trackingAFE payments
opsDashboard.v1 · rigs × wells × clocked days (/footage-ledger → /rig-calendar → plan) × /rig-cost spread