Job advisor
Optimal mud weight, circulating ECD and surface-pressure budget for every stored job, with margins to pore, fracture and breakdown pressure.
Paste your real Fann dial readings into the lab and publish the fit — the advisor will then solve every job on the measured curve instead of PV/YP.
Go to the Fann labThe advisor, the friction model and the simulation builder all solve through the same entry point — this picks which closure they use. Fann readings left at 0 are estimated from PV/YP. Jobs matched to a well with a stored tubular tally ignore the hole/pipe pair and integrate friction over the real string.
Auditing stored jobs…
Each stored job is solved three ways on its own geometry and mud weight — Bingham plastic (τ = YP + PV·γ̇), Herschel–Bulkley (τ = τ₀ + K·γ̇ⁿ) and Power-law (τ₀ = 0). Jobs with a stored Fann sweep use their own regressed n / K / τ₀; the rest fall back to the shared PV/YP dials. Tolerance 0.05 ppg ECD.