Wellbore Genius
Help

Torque and drag calculator

Field units
No login

Pick-up, slack-off and rotating hook loads and off-bottom torque for a build-and-hold well. Every equation and assumption is listed under the answer.

Runs in your browser; nothing is saved or sent. All free tools

Build-and-hold soft-string

End of build6,900 ft MD
Pick-up hook load162.7 klbf
Rotating off-bottom108.6 klbf
Slack-off hook load51.4 klbf
Off-bottom rotating torque8,295 ft·lbf
  • Soft-string model (Johancsik et al. 1984): ΔF = wΔL cosθ ± μN, N = |FΔθ + wΔL sinθ|, ΔM = μNr, 10 ft steps, no azimuth change.
  • Uniform pipe, one friction factor, no WOB, no block weight, no tool joints or stiffness. Friction factor is your assumption — calibrate it to a measured hook load.